Investigation
A joint investigation by the HSE and Environment Agency (EA) into the release of the hydrochloric acid in January 2020 found that pipework had not been installed, maintained and inspected sufficiently which led to several smaller pipe failures before the more serious loss of containment. The investigation found that pipework had not been properly maintained, and a protective chemical-resistant coating had not been applied to the full height of containment walls.
An investigation by HSE into the release of sulphuric acid in August 2020 identified a lack of inspection and maintenance of the pipework and valves. The leak continued for a further two days due to the inability to operate a manual valve to stop the process. The loss of containment was eventually stopped on 31 August 2020. Fortunately, no one was harmed.
The company has been fined £2.4 million in relation to charges under the Health and Safety at Work etc Act 1974 and a further £100,000 in relation to charges under the Environmental Permitting (England and Wales) Regulations 2016.
HSE principal inspector Maria Strangward said: “The uncontrolled release of significant quantities of hazardous substances in these cases was entirely avoidable.
“An appropriate planned maintenance programme should have been in place to ensure that pipes do not fail, and valves operate. The proactive maintenance of pipework and safety critical valves is extremely important at sites such as these.
“Industrial Chemicals Limited’s West Thurrock site is classified as an upper tier site under the Control of Major Accident Regulations 2015, so that businesses and communities are protected, and potential major accidents avoided.”
Adrian Sherman, Environment Agency regulatory officer, said: “The Environment Agency takes its regulatory responsibilities seriously to protect communities and the environment.
“We expect businesses to comply with their environmental permits and will take appropriate enforcement action when they fail to do so. In this case, an appropriate inspection and maintenance programme could have prevented an environmental and public health risk.”
The HSE prosecution was brought by enforcement lawyer Samantha Wells, who said: “At the sentencing hearing the judge noted the previous history of poor health and safety standards by this defendant, which included previous incidents relating to poor maintenance of pipework at this site showing a careless attitude to health and safety which was treated as an aggravating factor which uplifted the sentence imposed.”
The EA prosecution was brought by EA lawyer Laura King.